this post was submitted on 10 Dec 2023
111 points (84.5% liked)

[Dormant] Electric Vehicles

3213 readers
1 users here now

We have moved to:

[email protected]

A community for the sharing of links, news, and discussion related to Electric Vehicles.

Rules

  1. No bigotry - including racism, sexism, ableism, casteism, speciesism, homophobia, transphobia, or xenophobia.
  2. Be respectful, especially when disagreeing. Everyone should feel welcome here.
  3. No self-promotion.
  4. No irrelevant content. All posts must be relevant and related to plug-in electric vehicles — BEVs or PHEVs.
  5. No trolling.
  6. Policy, not politics. Submissions and comments about effective policymaking are allowed and encouraged in the community, however conversations and submissions about parties, politicians, and those devolving into general tribalism will be removed.

founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 11 points 11 months ago (3 children)

Were people actually expecting the construction to start immediately or something? There's absolutely wrenches being thrown at the process, and all of the planning and construction time on top of it all.

[–] [email protected] 4 points 11 months ago

The plan all along was to complete everything by 2027, with construction starting in '24 and '25. Every state I've cared to look at has a published plan and timeline. 🤷‍♂️

[–] [email protected] 2 points 11 months ago

It's going to be 90% planning and permitting. 10% construction. There's very little construction needed. (It may even be 99:1).