204
submitted 2 months ago by ray@lemmy.ml to c/videos@lemmy.ml
you are viewing a single comment's thread
view the rest of the comments
[-] VibeSurgeon@piefed.social 27 points 2 months ago

Allow existing nuclear to keep operating? Yes

Allow new nuclear to be built, assuming the constructors fully finance and assume the risk of the project themselves? Also yes

Subsidize nuclear over renewables? No

Allow nuclear to be used as a wedge for the fossil fuel propaganda machine to keep their emissions going, since building nuclear takes decades and costs far more than renewables, displacing potential investment in renewables? Not a chance in hell

I have nothing ideological against nuclear, but it is way overdue that nuclear boosters face the music and acknowledge what role the technology is having in the political landscape at the moment.

[-] corsicanguppy@lemmy.ca -4 points 2 months ago

building nuclear takes decades

regulatory: 3-5 years

site prep and build: 3-5 years

stocking, staffing, startup: 1-2 years

If we rush the regulatory, it's then 4-7 years; or not even one decade.

I'm not saying it's overnight, but it's not 'decades'.

[-] VibeSurgeon@piefed.social 7 points 2 months ago

Rushing regulatory for a construction project where failures are as severe as they can potentially be with nuclear is beyond deranged.

Getting to the timelines you're mentioning would require a mature nuclear industry with standardized builds, something which would take more than a decade to develop, at a steep premium.

Again, I support any investor willing to go there to do so, but there's a good reason none do - these things quite simply do not pencil out.

[-] SaveTheTuaHawk@lemmy.ca 3 points 2 months ago

SMRs take a few years, and a fraction of the price, which is why China is building them and already has one on line.

[-] dreamkeeper@literature.cafe 0 points 2 months ago

Where's a real world example of a nuclear plant being built in just 4 years? In the US it's more like 10 years, at least.

No one's building them because they're barely profitable even after they're up and running for many years.

[-] PowerCrazy@lemmy.ml 4 points 2 months ago* (last edited 2 months ago)

Why is profitability a requirement for infrastructure? Is mass-transit profitable? Is air travel profitable? Are highways profitable? Are suburbs profitable? Why is that even a concern? Would coal or gas plants be profitable? Hell, are solar panels actually profitable? I'm not so sure.

[-] SaveTheTuaHawk@lemmy.ca 4 points 2 months ago* (last edited 2 months ago)

Where’s a real world example of a nuclear plant being built in just 4 years?

Chinese SMR.

https://www.reuters.com/business/energy/china-start-commercial-operation-first-small-modular-nuclear-reactor-2026-2025-12-11/

Ontario is building 4 SMRs, the first will be operational in 2028.

This thread is like US nuclear, 40 years behind.

[-] PolandIsAStateOfMind@lemmy.ml 2 points 2 months ago

Where’s a real world example of a nuclear plant being built in just 4 years?

39 months for Unit 6 of the Kashiwazaki-Kariwa Nuclear Power Plant in Japan

this post was submitted on 01 Feb 2026
204 points (97.2% liked)

Videos

6419 readers
1 users here now

Neat vids from youtube or wherever. Rules later

founded 6 years ago
MODERATORS