this post was submitted on 27 Sep 2024
105 points (100.0% liked)
chapotraphouse
13530 readers
166 users here now
Banned? DM Wmill to appeal.
No anti-nautilism posts. See: Eco-fascism Primer
Gossip posts go in c/gossip. Don't post low-hanging fruit here after it gets removed from c/gossip
founded 3 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
If I didn't want the house to burn down for the insurance, I'd probably go shoot the power line down. Finally a use for BMG.
that sounds pretty dangerous and i'm not sure if it would even work, because for it to work it requires line to get shorted somewhere else with better ground resistance, tripping breaker at substation. if it fails, you have now high step voltage on the ground and not just near water pipes underground. or it requires line to be cut, and to be sure you'd need to hit all 4 (euro) or 3 (american) wires or insulators. or you could try to pull out fuses at substation, (with insulated tools, on low voltage side) at least for these that i've seen it's possible (like this one https://www.sonepar.fr/catalog/fr-FR/products/05584019458). if fuses are bolted on tho, shit outta luck. (no idea what americans are using)
e: the more i read about american electrical code, the more horrified i get. you can get mains voltages of 120v phase-neutral, 208v phase-neutral, 208v interphase, 230v interphase, 240v interphase, 240v phase-neutral, 277v phase-neutral, perhaps 416v phase-neutral, 480v interphase, or perhaps 480v phase-neutral. of which 277v and 480v are for business customers only? (and 347v, 600v in canada)
this can only be a result of plug manufacturers conspiracy
if you want to supply both three-phase and single-phase, supply three-phase as symmetric three-phase + neutral and supply single-phase as phase-to-neutral. it's simple, it's sane, it's standardized, and it's efficient in copper. that way nobody needs 200A circuits, 7kV transmission line running down every damn street and substation every 5 houses because all high power loads are three-phase, that also means no large imbalances in load happen
it looks like end result of decades of penny pinching managerialism with zero planning for any standardization
Hamas has opened a new front.