2
Scheduled outage 2023-09-26 @ 3:00 UTC
(leminal.space)
Server upgrade was completed with less than five minutes downtime. An additional CPU core was added with RAM and block storage doubled. The latter was particularly necessary due to the growth of the database since inception.
Announcements from the admins of Leminal.Space