this post was submitted on 24 Aug 2024
106 points (100.0% liked)

Technology

37746 readers
418 users here now

A nice place to discuss rumors, happenings, innovations, and challenges in the technology sphere. We also welcome discussions on the intersections of technology and society. If it’s technological news or discussion of technology, it probably belongs here.

Remember the overriding ethos on Beehaw: Be(e) Nice. Each user you encounter here is a person, and should be treated with kindness (even if they’re wrong, or use a Linux distro you don’t like). Personal attacks will not be tolerated.

Subcommunities on Beehaw:


This community's icon was made by Aaron Schneider, under the CC-BY-NC-SA 4.0 license.

founded 2 years ago
MODERATORS
 

“These big companies think they can enter small villages like ours, take our land, and destroy it.”

  • Microsoft is building a data center in Mekaguda, a village in the southern Indian state of Telangana, which is expected to start operations by 2025. About 70% of the construction has been completed.
  • Last month, the state government intervened after Microsoft cited problems with the local village council.
  • A group of local residents has filed a petition against Microsoft, claiming encroachment and the dumping of industrial waste in a nearby body of water. The court hearing for the petition is pending.

Addition: Why are E-Waste Strategies in Need for Sustainable Data Centers?

E-waste in data centers encompasses a wide array of discarded IT equipment such as servers, power distribution units, and other electronic components that are no longer in use. Despite the rapid pace of technological upgrades, the alarming statistic from the UN forecasts that e-waste volumes could reach 74.7 metric tons globally by 2030.

you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 5 points 3 months ago

Maybe a local construction company dumping stuff?