sniper_matt

joined 1 year ago
[–] [email protected] 1 points 1 year ago

20m is nothing, doing 500’ for the ‘far’ units at work.

If you are able, you could optimize your setup by having both locations on the same phase in the electrical panel, and if able, same bus connection point. Using circuits that have no gfi plugs , or arc fault breakers is also ideal. You want the units connected directly to the wall, and not anywhere else.