mars0008

joined 1 year ago
 

I am thinking about getting a framework 16" laptop but one thing that is making me hesitant is the delivery time which says "Q2 2023" (Batch 14). It is November so that makes it 5-8 months which seems a loooong time to wait.

Is it usual to have to wait that long for a framework laptop?