PLEASE get us out of the Biff timeline
Lol I've got like 2-3 ACs then 😂
I have to split power between 3 different circuits that are near my office in order to keep each one within the 80% rule in the event I'm putting heavy load on them
....I really need to get an electrician out to put in a 240 line 😅...
I don't think I can get the amount of panels needed, as-is my system can produce about 700-800 watts in a good sunny month (which the month they used wasn't really, it was Feb and it produced about 600-650)
But my electric company has some dumbass arbitrary limit on the amount panels the professional installers have to follow and I'm pretty sure I'm close to it
I've been meaning to check out this "unofficial" DIY plugin solar stuff, but haven't gotten to it yet lol
Hmm I think you're crossing into home datacenter territory.
I've got some rookie numbers to pump up LMAO
Like 3 or 4 1u/2u servers equipped with a couple GPUs, plus a tape library lol
I call it the Tomacco. Not responsible if you feed it to animals
That too, but some jurisdictions put some guardrails for pulling full prior permits, when I wanted to pull all the historical permits for my house for my own records, I had to bring in some proof that I was either the owner, tenant or other interested party (like say a contractor who want to see the previous permits before doing their own work)
In most places in the US, basic home specs are public record and/or just floating around since the last time it was publicly listed for sale
Are they taking on new contracts??
cm0002
0 post score0 comment score


Thankfully I'm in a legal state lol