Someone in my city did this. Their car blocked the tram. The tram company ordered taxis for all passengers, and the car owner had to foot the bill.
Here you can get 12TB, new, from a trusted German seller, for 129€, which is 1.075 cents per GB.
Amazing! What is left to do now? Orbital Raptor relight and dummy payload deployment? Do they need a new launch license for that, or is the current one (which should be good for similar flights if I understand correctly) sufficient? S31 + B13?
I assume they will want to demonstrate the V2 flap design before attempting a ship catch. They also need the second tower for that, unless the booster can be destacked sufficiently fast.
I took my existing JPEG file, compressed it using JXL, 15% smaller.
Then I decompressed it again into JPEG. The file was bit-for-bit identical to the original file (same hash). Blew my mind!
Directly using JXL is even better of course.
You can check heavens above (adjust your location) to check when it will be visible for you.
Wait a second, it’s going to pass over my house in 5 minutes!
Edit: Shit, clouds!
Edit2: I was able to see it through a few gaps in the cloud cover!
Without UEFI, the boot process is different for each device, requires a custom boot loader, or at least explicit support by the operating system. Is your laptop going to be supported by the distribution you want to use? What about in 5 or 10 years? With UEFI, the boot process is standardized, so it should just work.
That was some Columbia-level damage that Starship experienced during reentry, and yet it successfully retained control authority, completed a soft landing, and everything was live streamed. Amazing!
The booster seems to be almost ready for the first catch attempt (depending on the accuracy of the landing).
I wonder to what extent they can retrofit Ship 30 to reinforce the hinge of the flaps, and how long that is going to take? On the other hand, the ship did survive, so maybe they will just repeat the launch without any major fixes, and try a few different things? (Deorbit burn, maybe even suborbital test-mass deployment, or more aggressive tests of the heat shield?)
The next-generation Starship design has less exposed flaps with reinforced hinges already. But is it already in production?
This article has been removed at the request of the Editors-in-Chief and the authors because informed patient consent was not obtained by the authors in accordance with journal policy prior to publication. The authors sincerely apologize for this oversight.
In addition, the authors have used a generative AI source in the writing process of the paper without disclosure, which, although not being the reason for the article removal, is a breach of journal policy. The journal regrets that this issue was not detected during the manuscript screening and evaluation process and apologies are offered to readers of the journal.
The journal regrets – Sure, the journal. Nobody assuming responsibility …
Then the editor, all extensions, language servers, etc. are all running as root.
shadowtofu
0 post score0 comment score
Hmm. Let’s say I add 6 SSDs, 2TB each, for a total of 600€. In a RAID6 configuration, that gives me 8TB of storage. Compare that to a classical NAS with 2×8 TB HDDs for a total of 350€.
The HDDs will draw around 4W idle each, 8W in total. Assuming 0.3€/kWh, over a span of 5 years, that is approximately 100€. The power consumption of the SSDs will be negligible.
So, just in terms of storage, the SSD solution is around 33% more expensive over 5 years. If you include the cost of the NAS itself, the price increment is even less noticeable.