you are viewing a single comment's thread
view the rest of the comments
[–] -5 points 1 week ago (8 children)

If productivity increased then you had some slackers before

  • source
  • hideshow 8 child comments
  • [–] 7 points 1 week ago* (4 children)

    4 day work weeks often means working four 10hr shifts. Same hours but less start and stop adds to productivity, and that extra day off during the work week means you can schedule things that day that otherwise would require time off during work hours. That extra day off really helps both employer and employee.

    4 tens is so much better than 5 eights.

  • source
  • parent
  • hideshow 4 child comments
  • [–] 2 points 6 days ago

    4 tens is so much better than 5 eights.

    Going to need a citation for that, because that is not what the research I've seen suggests.

    From this paper:

    This paper studies the link between working hours and productivity using daily information on working hours and performance of a sample of call centre agents. We exploit variation in the number of hours worked by the same employee across days and weeks due to central scheduling, enabling us to estimate the effect of working hours on productivity. We find that as the number of hours worked increases, the average handling time for a call increases, meaning that agents become less productive. This result suggests that fatigue can play an important role, even in jobs with mostly part-time workers.

    The full article is behind a paywall, but the discussion paper is available in full here.

    Another paper suggests that, while same-day performance can sometimes increase with number of hours, next-day performance suffers. And, more importantly, routinely working shifts that are longer than 8 hours reduces productivity over time:

    To start, we elucidate the tension between a widely held assumption grounded in the ideal worker norm that working long hours boosts performance and recovery research suggesting the opposite. Our findings reveal that, although working a long day is associated with a same-day performance boost, working long hours hinders overnight recovery by reducing sleep, hindering next-day performance. Our results also cautiously suggest that regularly working longer than 8-h days results in fatigue and a lack of resilience, making it difficult for employees to sustain high levels of performance over time.

    I have consistently seen the four-day workweek defined as 32 hours per week (4x8hr), not 4x10hrs.

  • source
  • parent
  • [–] 7 points 1 week ago

    I've tried that before. I get less done on a 10 hour shift than I do in 8. Have to wake up too early and go home too late. It's torturous.

    Now a 32 hour week for the same pay is peak. Doesn't even need to be three continuous days off. A weekend and a Wednesday is good enough.

  • source
  • parent
  • [–] 1 point 1 week ago

    That's not what they mean by the 4 day work week. I've had the 4 10 hour days and friending in the work you're but very productive with a day that long. It's hard to be in the zone thinking hard for 10 hours.

  • source
  • parent