this post was submitted on 28 Apr 2025
1105 points (96.1% liked)

Microblog Memes

7486 readers
2918 users here now

A place to share screenshots of Microblog posts, whether from Mastodon, tumblr, ~~Twitter~~ X, KBin, Threads or elsewhere.

Created as an evolution of White People Twitter and other tweet-capture subreddits.

Rules:

  1. Please put at least one word relevant to the post in the post title.
  2. Be nice.
  3. No advertising, brand promotion or guerilla marketing.
  4. Posters are encouraged to link to the toot or tweet etc in the description of posts.

Related communities:

founded 2 years ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] [email protected] 9 points 9 hours ago

South Australia has run into this problem and implemented a solution.

When the solar exports in a section of the grid exceeds the local transformer's limits, a signal is sent to all of the inverters in that section to limit the export rate. The same signal can be send to all solar inverters in South Australia if the entire grid has too much renewable energy.

This signal only limits the export to the grid, so the homeowner can always use their own solar power first. The permitted export is guaranteed to be between 1.5kW and 10kW per phase.

The was a minor oversight during implementation. Homeowners on wholesale pricing would often curtail or switch off their solar inverters if the prices went negative. If the grid operator sent a signal to reduce the export rate, it would override the homeowner's command and force a 1.5kW export during negative pricing (costing the homeowner to export). No-one considered that anyone might not want to export solar all of the time.