32
submitted 2 years ago by [email protected] to c/[email protected]
you are viewing a single comment's thread
view the rest of the comments
[-] [email protected] 4 points 2 years ago* (last edited 2 years ago)

i think another north-south line, probably along Willingdon and passing through Metrotown, Brentwood, BCIT, Playland, and going into North Van, turning west until the Seabus terminal would be ideal. To the south it could stretch to Queensborough and then South Surrey.

It'll never go all the way to West Van though, too many NIMBYs.

But we desperately need a skytrain line that crosses the Burrard inlet.

[-] [email protected] 3 points 2 years ago

Skip westvan.

Playland - cap college - sentinel/99 - cypress/99 - horseshoe

Fuck the rich bitches.

[-] [email protected] 2 points 2 years ago

But Horseshoe Bay

[-] [email protected] 3 points 2 years ago

They've already greenlit a skytrain line from North Van over the second narrows. They havent decided between their two options of either going south to metrotown, or turning west along hastings-ish. But they said they won't start construction until around 2030 (which I'm just expecting to be delayed further)

I think its supposed to go through to Park Royal.

[-] [email protected] 1 points 2 years ago

West Van is an absolute nightmare to get to from anywhere in Metro Van

this post was submitted on 09 Aug 2023
32 points (90.0% liked)

Vancouver

1741 readers
1 users here now

Community for the city of Vancouver, BC

founded 4 years ago
MODERATORS