this post was submitted on 25 Jul 2023
154 points (98.1% liked)
Europe
8484 readers
1 users here now
News/Interesting Stories/Beautiful Pictures from Europe ๐ช๐บ
(Current banner: Thunder mountain, Germany, ๐ฉ๐ช ) Feel free to post submissions for banner pictures
Rules
(This list is obviously incomplete, but it will get expanded when necessary)
- Be nice to each other (e.g. No direct insults against each other);
- No racism, antisemitism, dehumanisation of minorities or glorification of National Socialism allowed;
- No posts linking to mis-information funded by foreign states or billionaires.
Also check out [email protected]
founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
No, you can't. Adding a large number of EV chargers requires a significant upgrade to the electrical grid. This is a massive infrastructure challenge. Charging an electric vehicle consumes a large amount of electricity, and the current electrical grid may not be equipped to handle a significant increase in demand. This could lead to overloads and blackouts.
Unlike refueling a car with gasoline, charging an electric vehicle takes a significant amount of time. Even with fast chargers, a full charge can take more than an hour. This would mean that you wouldn't be able to put nearest gas station in your Waze, you might need to cruise around an unknown city, looking for a free spot.
The cost of installing EV charging stations is significant, and it's not clear who should bear this cost. Should it be the government, property owners, or the consumers? Additionally, the maintenance and repair of these charging stations are not negligible.
If the electricity used to charge the vehicles is not generated from renewable sources, then the overall environmental impact could still be significant as well as impact on the electricity prices.
There is a lot one should consider before writing witty replies.
A lot of generalization and supposition in the above.
Adding charging stations may require grid upgrades, but its a slow and steady requirement you can do neighborhood by neighborhood. Depending on the neighborhood, it may not be required, be minor, or be massive. It all depends. Making sweeping generalization about power generation, a deeply localized utilty, is a poor choice.
In my locality and most of my state, a large amount of charging spots are going up in front of common retailers with no clear utilty work. Our grid is currently fully able to bear the added load.
As to who pays for it, the current system seems to work, and will only improve as more cars go electric. The most effective method seems to be a mesh of private/public investment. Public for grid sizing, power supply and sometimes space for the charger. Private cost of wholesale power, charger install and maintenance, interoperability and paymebt processing. The Private entity takes the gross profits in the above, paying for power and any split with other private entities. The public has its costs covered and has a net positive public good added.
It is not that complicated to install charging infastructure 2 chargers at a time. It seems pretty apparent that retail spaces at least in the US are over built powerwise, and can largely handle the addition. Its why many grocery stores have them popping up suddenly in urban areas.
As to the cleanliness of energy, one large pollution provider is overall more environmentally friendly than millions of small ones. They can also be regulated and inspected in a way millions of small ones cannot be. Centralized generation of power for cars via electricity, of any source, will be greener than millions of cars burning gasoline. Always. Shifting the load to renewables as well is the right answer, but any shift here is good.
Stop saying this is a "massive infastructure challenge" when its actually a small and steady challenge occuring thousands of times. Small things done over and is the massive part, and they are very doable today, in the US and the EU.