this post was submitted on 12 Sep 2023
1 points (100.0% liked)

UK Energy

0 readers
1 users here now

A place to post links and discussions around the UK's energy production, National Grid, energy consumption, and green energy news.

See https://grid.iamkate.com/ for the UK's current energy production and sources.

Created 23/07/23

Subscriber Count

founded 1 year ago
MODERATORS
 

The agreement enables closer liaison, information sharing and joint planning, and is a result of feedback gathered through public consultation, which has shown a preference for more cooperation and coordination between the two projects on the landfall location, onshore corridor route, substation location and stakeholder engagement.

...

Under the now-signed “good neighbour agreement”, each project has reduced the maximum number of export cable circuits it will include from four to two, which will result in the reduction of impacts both onshore and offshore, particularly during the construction phase, according to the North Falls joint venture.

Furthermore, the combined construction corridor is now proposed to be 90 metres wide, rather than the previous width of up to 250 metres.

North Falls also recently decided on the location of its landfall construction compound, which is now planned to be closer to Five Estuaries announced preferred landfall.

The Five Estuaries offshore wind project has also recently selected its preferred substation search area which now overlaps with North Falls’ substation search area.

no comments (yet)
sorted by: hot top controversial new old
there doesn't seem to be anything here