Starbase activities (2025-06-07):
- Jun 6th cryo delivery tally. (ViX)
- Jun 6th addenda: A new stand of some kind is spotted at the build site. (ViX)
- Booster transport stand returns to Pad 1. (ViX)
- Launch site: Two new vertical tanks arrive, and are is lifted almost into place. (ViX 1, ViX 2)
- LOX pump #8 is lifted into position at the pump farm. (ViX)
- The second section of booster quick disconnect cover arrives. (ViX)
- Steel plates are installed in the flame trench. (Anderson)
- B16 is lifted off of Pad 1 and placed onto transport stand. (NSF 1, NSF 2, LabPadre, ViX)
- B16 receives a slight bump on the way down. The retraction of the alignment pins at a time when neither the stabilizing arms on the chopsticks nor the clamps on the transport stand were engaged, caused B16 to swing freely and hit the interior of the transport stand a few times. (ViX, Golden)
- Chopsticks release B16 and descend, transport stand clamps engage. (ViX, NSF)
- B16 moves to the entrance of Highway 4 in preparation for rollback to the production site. (NSF)
- New road delay for between Jun 7th 22:00 to Jun 8th 02:00, presumably for B16 rollback. (cityofstarbase, archive)
- B16 rollback begins. (NSF)
- Build site: Sheet piling rig continues work on the Gigabay foundations. (ViX, Anderson 1, Anderson 2)
Florida: