0
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
this post was submitted on 24 Nov 2023
0 points (50.0% liked)
Home Networking
315 readers
3 users here now
A community to help people learn, install, set up or troubleshoot their home network equipment and solutions.
Rules
- Please stay on topic.
- Please use the search function to look for keywords related to what you want to ask before posting since most common issues have been answered.
- No Ads. This community is for support and discussion. Ads and self promotion are not welcome here.
- No product reviews or announcements. If you have a question about a product, be specific about what you want to know.
- Be civil. Don't be a jerk. Not being a jerk is surprisingly easy.
- No URL shorteners. URL shorteners tend to hide the real use of a link. For this reason, please use normal links, even if they're long.
- No affiliate links.
- No gatekeeping. With profession shall come professionalism. Extend help without judging others for their ignorance. The same goes for downvoting of comments or posts for "stupid questions" or not being as knowledgeable as others.
founded 2 years ago
MODERATORS
You can run the cables from the top of the stud bay/cavity to the bottom of the same cavity/stud bay and secure the low voltage box at the height you want your rack.
Tip: Once you get below the low voltage bracket use loosely attached zip ties the rest of the way down in the stud bay , this way you can pull the cables up and out of the wall easily after it’s sheetrocked.
Seems simple enough, thank you!
Welcome. Here is a more detailed answer
Hammer hook nails into the stud (make sure to hammer a hook nail within 4 inches of your main hole at the top of the stud bay, and hammer another hook nail within 4 inches of your low voltage box, and then hammer another hook nail within 4 inches of the bottom. Then run zip ties through the hook nails to secure your wires. Any zip ties below the low voltage box will be zipped loosely around the wires through the hook nail so you can pull the wires up and out when you are ready to terminate.
Basically just follow what the electricians do, but leave your stuff loose enough to pull back up and out the wall after drywall.
If you zip tie too tight you will have to yank hard to get one wire free then the rest will move easily, or you will need to cut Sheetrock to get your wires back out the wall.