you are viewing a single comment's thread
view the rest of the comments
[–] 6 points 1 day ago (1 child)

Or, JIRA ticket: complete the entire 18 month project

  • source
  • parent
  • hideshow 1 child comment
  • [–] 2 points 22 hours ago

    Honestly I don't mind this one that much. IFF it is well designed, the entire team is in the loop of what's to be done, and you don't get immediate unrealistic time pressure.
    I've always preferred working on JIRA tickets that were meatier than having to work on 15 different tickets in one day. The context switch just eats a bit too much energy for me every time.

  • source
  • parent