you are viewing a single comment's thread
view the rest of the comments
[–] 0 points 2 weeks ago (1 child)

I wonder how many sites where they can find that power readily available throughout Europe. European networks were never designed for that type of draw.

It seems like they will need to provide big battery stations to do that rate of charging.

  • source
  • hideshow 1 child comment
  • [–] 4 points 2 weeks ago

    Each Flash charger carries 370kWh of on-site battery storage, split across two 185kWh units, allowing a site to draw as little as 100kW or as much as 560kW from the local grid

  • source
  • parent