Sure, a long as those cables are shielded. Crosstalk was a real thing "back in my day".
post
I hear you, but how often have you had to swap out a cable compared to how often have you had to deal with a rats nest? This isn't a whole lot different than zip tying groups of cables together.
IMHO this would be even better with 6 different colors per braid. Then you could trace a cable in a few seconds while also not having a rats nest.
Edit: oops, this was supposed to be a reply to another comment.
Velcro is almost always the way to go with cable management. Zip ties can easily damage the wire and encourage messy wiring since you have to cut and replace every one to change a single wire.
Wire lacing is OK for permanent installations, but good luck changing anything.
Velcro costs so much more than zip ties.
But you can cut a zip tie. This is terrible if you have to replace a cable.
You could also use tape tags on the ends, either color or number codes. Just mark both ends of each cable.
When you have automated most of your job, but you still take Adderall every day.
That's actually not that awful. Time consuming and you better not need to change the loom after it's done, but that doesn't become spaghetti that easily. At least not until someone adds few individual (and way too long) cables tangled to those.
It's awful considering braided cable sleeve is orders of magnitude cheaper than IT labor.
I'd guess braiding is not that much more time consuming than fighting cables in a sleeve. Personally I'd use velcro-straps, but on our team there's always too little time to actually make things look decent, so pretty much all is in various stages of spaghetti, depending on which cabinet you're looking for.
If these are UTP, I demand a screenshot of cat /proc/net/dev and of some third party packet checking software that measures crosstalk and bit error. 😂
First read this as “it’s braindead.”
I actually had to teach someone in my uni course how to braid power cables for a induction motor. Do they not teach basic skills in preschool anymore?
unpopular opinion:
The effort of "tidying up" cables is never worth it.
You'll always end up having to change something and your sophisticated cable management turns a 5 minute job into a 1 hour job, as you open zip ties and dig out cables.
Just use the correct cable length, plug that shit in in a sensible order, label both ends with numbered tape, and let it look messy.
The first step is using correctly sized ethernet cables. Dont use a 12 ft cable for a 3 ft run. There shouldnt be more than a foot of slack in general. You dont need to "tidy" excess you dont have.
Then, for when you do need to tidy cables, use velcro ties, not zip ties. Ideally, you still label all the runs, especially the long ones. Seems a bit redundant for 3ft, but its still helpful.
At least put in the minimum effort of trying to follow the original path (assuming someone worth their salary actually was involved in the making of the site.).
Youd be surprised at the difference in mess from just plugging 'a to b' and 'a to b via c' no matter how many techs having been involved.
I'd obviously plan the initial setup, start with connecting ports close together via short cables, then put the longer connections on top, avoid unnecessary crossings.
And when switching out a cable, look for the most direct path
God forbid you have to swap out a cable or a port does on the switch. You will spend 20 min trying to figure out what cable goes where
Or you could mark the bad one, replace the whole set, then unbraid and toss the marked one later in a dumb meeting you have better things to do than attend or something :p
Ah yes, a twisted pair.
all 45 comments