That still is not correct.
Planning a high speed high throughput flexible passenger rail network is a whole different beast than laying non-electrified single track lines in a straight line through the middle of nowhere that basically only serves the occasional 2miles long freight train.
The parameters are vastly different and almost incomparable. And America has decidedly no expertise left in the former.