you are viewing a single comment's thread
view the rest of the comments
[–] 6 points 2 days ago*

As someone who does utility designs, yes. This is a requirement for when anyone attaches.

If a telecom wants to co-locate/overlash on an existing power pole, they're required to bring the pole to spec.

Which, according to NESC standards, means you have to be a minimum of 10' away from foliage.

  • source
  • parent