That is another problem, everyone rushed to buy all the AI hardware and then didn't realize that some parts (like getting connected to the power grid) might be a huge bottleneck in the system

Imagine being that stupid that you don’t account for…electricity. The indomitable captains of crapital everyone.

  • source
  • parent
  • hideshow 4 child comments
  • [–] 29 points 2 weeks ago (2 children)

    Hey, that is not my job. My job is to buy the GPUs and the RAM and the SSDs, making use of all that is another guy's problem.

    That is why the new frontier is not backup diesel or LNG power, but fully or partially off-grid datacenters. I've seen that some are even buying less efficient jet turbines for power generation because there is such a huge backlog.

    https://www.techspot.com/news/110732-jet-engines-diesel-generators-step-data-centers-outpace.html

  • source
  • parent
  • hideshow 2 child comments
  • [–] 5 points 2 weeks ago

    They're going to recreate XB-0 Hresvelger from Ace Combat as a mobile data center hidden in the mountains of Eastern Europe. It's destroyed by the Allied Forces before it can take flight as their planned and permanent aerial data-ship connected by satellite and fueled by atmospheric FBOs (floating base operator).