Trains in Switzerland Are Now Running Over Solar Panels in a First-of-Its-Kind Test
(www.zmescience.com)
Really long and thin strips that can't be angled. They can only be serviced while the track is closed and need to survive whatever debris a train might fling at them. Is this really the best way to place them?
Solar freaking railways.