Yes, that's why instead of expropriating people, we could be expropriating companies owning the rails, and double or triple the amount of tracks in that existing corridor. That's where demand currently is.
The line between Montreal and Québec City on the south shore is only double tracked until St-Hyacinthe. Past that, it's single track until Ste-Foy and trains have to wait to pass each other. Sometimes I'm five minutes away from Drummondville, the train is in the city. Then we have to wait 10 minutes delayed on a side track, a few hundred meters from the station, because there's only a single track passing on front of the damn station. There were two in the past. There's space, the second track is still there. But it's disconnected, has no switch, and the CN doesn't give a fuck.
It could easily be upgraded and worked around to help the movement of existing trains, but no. No upgrades, no changes. Just wait for the new shiny project that will not bring me where I want to go. Also, there are two single tracks routes between Montreal and Sherbrooke, and none of them is used to squeeze in passenger trains between freight trains. They're not even trying, as it would cost "too much money to run", and private construction companies would make much less profit.
I'm even eagerly awaiting the closure of a now abandoned line between St-Hyacinthe and Farnham, because the only good thing we will probably get out of this is a bike path in two decades.
Although for once, instead of expropriating farmers for highways, we're doing it for trains, and it's quite funny (or depressing) to see how socially acceptable it is for cars and highways, but not for trains.
EDIT: Just looking at it makes me angry 