you are viewing a single comment's thread
view the rest of the comments
[–] 11 points 16 hours ago (7 children)

Dude we just talked about the same thing today at work!!

My argument was: over the last 30 years or so, technology has allowed us to expedite everything. Anyone 40+ will remember insurance quotes taking days to hear back. Buying a car taking half a day or more when financing. Communicating in general.

With all the improved efficiencies or productivity gains, how are we still stuck working 40+ hours??

I hypothesize we could work 4x 7-hour days and keep the same amount of work if not more. Less time wasted! I feel it's easier to work harder in short bursts, but 8+hours drags on. When people are well rested and less stressed, we can get way more shit done!!

  • source
  • hideshow 7 child comments
  • [–] 3 points 11 hours ago

    Capitalism.

    Owners keep the profits. Labor does the work.

    It's a shit system. With some heavy restraints so labor got paid more and capital couldn't accumulate so much, it might be bearable. But we're in the bad place with much consolidation of money and power.

  • source
  • parent
  • [–] 2 points 11 hours ago (3 children)

    7 hours is too long for optimal productivity - requires a lunch break. 4x6 is optimal. Get in, do work, eat a snack, do work, go home. And if 24 hours was the standard some workers could do it as 3x8 and some could even do 2x12 with a day off in between.

  • source
  • parent
  • hideshow 3 child comments
  • [–] 2 points 11 hours ago (2 children)

    But having 5 days off knowing you'd go in for 12 hours twice a week, ain't nobody doing shit!! Attention spans aren't made for a straight 12 hours!! Maybe 4x 6-hours is doable. I actually do like the 3x 8-hour idea. A typical work day but you get 2 rest and 2 rec days. Not bad. Work would be actually tolerable.

    Either way, Anything over 25 hours should be overtime! Or 30 hours in my other example. No more salary bullshit where they suck you into unlimited work.

  • source
  • parent
  • hideshow 2 child comments
  • [–] 2 points 11 hours ago (1 child)

    It depends on the job. Field work or construction days can easily go 10-12 hours. It would be nice to get your work done in a couple days. And nurses who cover 24-hours often have long shifts. Could space them out with 2-3 days off in between.

  • source
  • parent
  • hideshow 1 child comment