From the story:

The property must connect to the City of Regina’s water main for “essential” potable water to meet fire safety regulations. The cooling system for the centre’s databanks will otherwise be a closed-loop system, filled separately, according to the report.

  • source
  • parent
  • hideshow 3 child comments
  • [–] 5 points 4 months ago (2 children)

    What a bunch of horseshit.

    Sure, sprinklers are required, but no reason that has to be connected to city water. And if the cooling system is that efficient and closed-loop, they could fill it by trucking in water instead. If they only have to fill it up once with the occasional top-off, filling the system up by tanker truck is a perfectly viable option.