you are viewing a single comment's thread
view the rest of the comments
[–] 3 points 2 years ago

Even if you assume that it is not blocked, it is still 5. The pipe from 2 to 3 is never reached because 4 leaks out the hole in the bottom. Assume that the hole in the bottom is a flaw and 4 still leaks out the top before the pipe to 3 is reached.

  • source
  • parent