[–] 8 points 2 months ago

I have committed the sin of mixing energy with power units.

I think its 300 MWh. Phase 3 just completed. Here is the proposal from Phase 4, which is supposedly going to increase from 300MW(?) to 600MW(?). The proposal is also kinda loose with their units.

https://efiling.web.commerce.state.mn.us/documents/%7BA0804E95-0000-C61C-8A33-56DF203E417D%7D/download?contentSequence=0&rowIndex=31