you are viewing a single comment's thread
view the rest of the comments
[–] 7 points 5 months ago* (last edited 5 months ago) (1 child)

The key question is if total costs along the pipeline, from requirements definition down to the final quality controlled fully debugged product can be reduced, at real LLM costs (not with the currently vastly subsidised costs).

  • source
  • parent
  • hideshow 1 child comment