[–] 14 points 8 months ago

Interesting read!

My key points are: 

So how do I estimate, given all that?
I gather as much political context as possible before I even look at the code.

and

 Finally, I go back to my manager with a risk assessment, not with a concrete estimate. I don’t ever say “this is a four-week project”. I say something like “I don’t think we’ll get this done in one week, because X Y Z

  • source