▲ 909 ▼ A new report finds Boeing’s rockets are built with an unqualified work force (arstechnica.com) submitted 2 years ago by vegeta@lemmy.world to c/technology@lemmy.world 127 comments fedilink hide all child comments
[+] piccolo@ani.social 3 points 2 years ago* (last edited 2 years ago) (1 child) [deleted] permalink fedilink source parent hideshow 1 child comment replies: [–] ripcord@lemmy.world 1 point 2 years ago I probably should have been more specific, though you're right. They seem to think though that NASA themselves did most of the design and manufacturing or something, instead of farming a ton of it out to various contractors (Thiokol, etc). That absolutely happened with STS. In fact, the Space Shuttle is where costs and time frames and project management and etc started to go off the rails - and led to where we are with Boeing and others today. It's a bad one to choose to make his point - even if we were actually still getting SOME shit done back then and the situation hadn't deteriorated so badly. permalink fedilink source parent
[–] ripcord@lemmy.world 1 point 2 years ago I probably should have been more specific, though you're right. They seem to think though that NASA themselves did most of the design and manufacturing or something, instead of farming a ton of it out to various contractors (Thiokol, etc). That absolutely happened with STS. In fact, the Space Shuttle is where costs and time frames and project management and etc started to go off the rails - and led to where we are with Boeing and others today. It's a bad one to choose to make his point - even if we were actually still getting SOME shit done back then and the situation hadn't deteriorated so badly. permalink fedilink source parent