this post was submitted on 26 Aug 2023
850 points (94.1% liked)
Technology
59581 readers
3041 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related content.
- Be excellent to each another!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, to ask if your bot can be added please contact us.
- Check for duplicates before posting, duplicates may be removed
Approved Bots
founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
Something like a body panel is going to expand/contract a couple of orders of magnitude more than 10 microns just from the weather changing day-to-day.
It's pretty common for a CMM to be in its own climate controlled room. Parts will be placed in the room and allowed to reach reference temperature for a several hours prior to measurement.
On production lines you usually skip the absolute measurement of a CMM and use go/no-go gauges. One should fit, one should not. They'll be made of a material with similar thermal expansion coefficients as your parts. As long as they've both been sitting around for a while they'll be at the same temp. They'll have expanded or contracted the same amount from reference so their relationship of go/no-go will still hold true.
The whole field of metrology is a never ending rabbit hole - really interesting the more you get into it.